Description
50MW natural gas cogen plant, 50Hz
The gas turbine and the alternator had a significant overhaul and renewal of major parts in November 2012 – documentation available on request.
Co-Generation Power Plant Alston Frame 6B 50Hz
GE Frame ‘6B’ Natural Gas Turbine – Alstom built with 8 combustion chambers
Alstom Starting Engine – Model F3PTA 400 Gr/2 – 450KW at 2,970rpm
Flender Graffenstaden Reduction Gear Box – Parallel drive speed
Alstom 3-Phase Alternator – Model T-214-234 with top mounted heat exchanger and air cooling station
Exciter, Output Cables, Safety System
Alstom Step Up Transformer – Model 1A TEV 001 TP, High voltage, 46mVA, 11kv/63kV, 50Hz
50MW natural gas cogen plant, 50Hz